This week’s activities:

  • Erect tilt wall panels at building C
  • Place RA/RB columns
  • Formwork rebar at ramp walls
  • Place building E tilt panels
  • Erect columns at building C

Next week’s activities:

  • Place level 2 slab building A
  • Sleeves, penetrations and mesh for level 3 slab building A
  • Place garage ramp walls
  • Place remaining tilt panels at building E
  • Framing building A level 1