This week’s activities:

  • Building E Level 2 and 3 Concrete Slab
  • Building A Level 1 Drywall and Insulation
  • Building C Roof Decking
  • Building E Level 3 Steel Columns
  • Building B Level 3 Outer Wall Framing
  • Parking Garage Level 1 Concrete Steel Reinforcement
  • Building B Level 2 Window Glass

Next week’s activities:

  • Parking Garage Level 1 Concrete Slab
  • Building D Glulam Beams
  • Building A Level 3 Inner Wall Framing
  • Building A Level 3 HVAC Ducts