DSO Building Update: August 27-31, 2018

This week’s activities:

  • Bldg. A Level 1 Store Front Doors
  • Bldg. A Level 3 Store Front Glass & Panels
  • Bldg. B Level 3 Interior Walls
  • Bldg. C Mezzanine Walls & Mechanical Equipment
  • Bldg. D Level 2 Wall Framing
  • Bldg. E Level 1&2 Wall Framing
  • Bldg. E Roof Decking

Next week’s activities:

  • Bldg. A Store Front Class
  • Bldg. C Interior Wall Framing
  • Bldg. C Level 1&2 Rough In
  • Bldg. D Level 1&2 Ducts