This week’s activities:

  • Building A Level 3 Low Walls
  • Building B South Side Concrete Ramp
  • Building B Level 3 Exterior Panels
  • Building C Level 3 Store Front Glass
  • Building C Level 2 Furred Downs
  • Building E Level 1 Store Front Framing
  • Parking Garage Lighting

Next week’s activities:

  • Building C Level 3 Exterior Panels
  • Building D Level 3 Store
  • Building D Level 2 Window Glass
  • Building E Level 1 Store Front Glass