This week’s activities:

  • Building A/B Bridge Galvanized Rails
  • Building A Level 2/3 Stair Case
  • Building B level 1 Ceiling Framing
  • Building B Level 3 Furred Down
  • Building B Level 2 Restrooms
  • Building D Level 2 Furred Downs
  • Parking Garage Concrete Slab

Next week’s activities:

  • Building A Level 3 Flooring
  • Building B Level Restrooms
  • Building D Level Duct Insulation
  • Building E Level 3 Ducts