This week’s activities:

  • Mechanical-Yard Concrete Slab
  • Storefront at Bridge C to D
  • Building A Level 2 Data Center Elevated Floor
  • Building C Level 3 Furred Down
  • Building E Level 3 Low Walls
  •  Building E Furred Downs
  • Parking Garage Level 2 Light Poles

Next week’s activities:

  • Building D Level 1 Furred Down
  • Building B Level 3 Flooring
  • Building C Level 2 Restroom Tile