This week’s activities:

  • Building A Level 1 Light Fixtures
  • Building A Level 3 Dirtt Walls
  • Building A South Side Curtain Wall Framing
  • Building B Level 1
  • Building C Level 3 Restroom Tile
  • Building D&E Bridge Storefront
  • North Side Concrete Side Walk

Next week’s activities:

  • Building D Level 1 Restroom Tile
  • Building B Level 3 Flooring
  • Building C Level 2 Restroom Tile