This week’s activities:

  • Building C Level 1 Light Fixtures
  • Building D west wood insert at columns
  • Building A Level 2 DIRTT wall panels
  • Building D & E Bridge wall framing
  • Building B & C Bridge wood at TV stand
  • Structural steel for louvered enclosure
  • Finish paint Building B Level 1

Next week’s activities:

  • Continue grading for Amphitheater
  • Continue Building C Level 2 DIRTT walls
  • Continue Building B Level 2 Light Fixtures
  • Building C Level 3 flooring