This week’s activities:

  • Pavers at terrace
  • Kitchen cabinets
  • Wood Ceiling at bridge B/C
  • Light fixture at lobby building C level 1
  • DIRTT walls building B level 3
  • Ceiling tile building B Level 2

Next week’s activities:

  • Continue limestone for the amphitheater
  • Continue building D level 3 DIRTT walls
  • Continue building D level 2 light fixtures
  • Pour concrete sidewalks west side of the building
10
Formwork sidewalk west side of building
9
Ceiling tile building B level 2
8
Curbs at north building
7
DIRTT walls building B level 3
6
Grading at northeast of building
5
Concrete stage at amphitheater
4
Wood ceiling at Bridge A/B
3
Cabinets building A Level 3
2
Pavers at Terrace
1
DSO Project

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s