This week’s activities:

  • Building C level 2 light fixtures
  • Curbs at fire lane
  • Light fixtures building B level 2
  • Metal Panels under bridge C/D
  • Wood slates at reception building C
  • Signage through all the buildings

Next week’s activities:

  • Continue grading for fire lane
  • Continue building A level 3 DIRTT furniture
  • Continue building E level 2 light fixtures
  • Continue limestone at amphitheater

 